Oil and gas

Technology built around how oil and gas actually operates.

CoreData connects well-site systems, automates field engineering work, and integrates SCADA, historian, and maintenance data — without replacing the systems your operation already depends on.

Common questions

What IT and automation challenges are common in oil and gas operations?

Well-site systems, SCADA, historians, and enterprise databases often do not talk to each other. Teams lose time re-entering the same data across control systems, maintenance databases, and reporting tools, and field connectivity can be unreliable.

How much time can automation save on well-site engineering work?

In one CoreData well-site integration project, automating standardized configuration uploads across SCADA, production allocation, maintenance, and historian systems cut control systems engineering time per site from about 3 weeks to 2 minutes.

Can existing systems be automated without replacing them?

Yes. Corejob Automation bots work alongside SCADA hosts, historians such as OSI-PI, maintenance systems such as IBM Maximo, and enterprise databases, connecting them without requiring a system replacement.

Does this require new hardware in the field?

Usually not. Most integrations work with the control systems, historians, and databases already in place, connecting through existing interfaces rather than adding field hardware.

Where CoreData fits

Four ways CoreData supports oil and gas operations.

01

Industrial IT services

Field connectivity, secure remote access, and monitoring for distributed operations.

Explore industrial IT →
02

Measurement & ImecCore

Field measurement data capture, validation, and well-site performance analytics.

Explore ImecCore →
04

Multi-system integration

Connect SCADA, historians, maintenance, and enterprise databases automatically.

Explore integration →

Proof from the field

Two projects, two operational results.

CBM well-site integration

Automatically uploads standardized well-site configuration into the SCADA host and RTU, production allocation database, IBM Maximo, and the OSI-PI enterprise data historian.

Result: cut control systems engineering time per site from 3 weeks to 2 minutes.

SAGD well pad datasheet cloning

Automated creation of over 980 instrument tags for a templated SAGD well pad design.

Result: cut instrument datasheet creation from over 4,000 hours to 26.

Bring the workflow

Where does field or well-site data slow your team down?

Talk with CoreData about measurement, SCADA integration, maintenance data, or well-site automation.

Contact CoreData